![]() |
| ||||||||
|
Super heavy tank designed as an alternative to the Maus, it used a modified Maus turret with the150mmKwK 44 with plans to upgrade it to the170mmKwK 44 later. Development of the E-100 started in June 1943 & continued steadily until 1944 when Hitler stopped all development of super heavy tanks. But even though, three engineers carried on the work at a low priority & by the end of the war they managed to nearly finish the first prototype which only needed a turret. The only prototype was sent to England after the allies captured it & scrapped post-war.
Weight: 140t
Crew: 5
Engine: Maybach HL234,
Speed:40km/h
Range:120km
Lenght:10.27 m
Width:4.48 m
Height:3.29 m
Armament:128mmKwK 44,7.92mm MG34